All services

Implementation-led recovery

Turnaround Management

Put joint full-time resources and a weekly performance rhythm behind a ten-month turnaround target.

A performance-based engagement applies the relevant SIOP, Lean, TQM and statistical methods through focused on-site implementation.

Ten-month performance system

A constrained plant gets a focused recovery engine.

TURNAROUND // TEN-MONTH PERFORMANCE ENGINE10-MONTH TARGETW01W08W16W24W40SIOPLEANTQMSTAT01 PLANT BASELINE02 JOINT RESOURCES03 FOCUSED METHODS04 WEEKLY KPI05 10-MONTH TARGETCONSTRAINTS AND KPIs MADE VISIBLE

The operating challenge

Change begins where the system is breaking down.

A pressured plant needs concentrated implementation capacity, visible weekly KPIs and the right methods applied to its actual constraints.

Documented method

The sequence shown in the system map.

01

Plant baseline

Make constraints and KPIs visible.

02

Joint resources

Deploy full-time client and LearnEX resources.

03

Focused methods

Apply SIOP, Lean, TQM and statistical tools.

04

Weekly KPI

Review progress every week.

05

10-month target

Drive the selected outcomes within the documented horizon.

What changes

Outcomes designed to remain after the engagement.

ToolsetSIOP, Lean, TQM and statistical methods applied as needed
VisibilityWeekly KPIs show whether interventions are moving performance
OwnershipJoint resources work directly on implementation

Start with a diagnostic

Bring us the challenge. We’ll shape the right first move.

Book a conversation
Chat with Deval