Breakthrough improvement
Six Sigma & Structured Problem Solving
Turn high-impact business problems into coached, verified improvement projects.
A project-based system combines Yellow, Green and Black Belt capability with DMAIC, GYR reviews, coaching, benefit validation and recognition.
Project-to-benefit pipeline
A chronic problem exits as a verified result.
The operating challenge
Change begins where the system is breaking down.
Methods become capability only when teams select meaningful projects, apply the tools under review and validate the business result.
Documented method
The sequence shown in the system map.
Select impact
Choose projects with meaningful business impact.
Build the team
Develop the appropriate belt capability.
Run DMAIC
Define, Measure, Analyze, Improve and Control.
GYR reviews
Green-yellow-red reviews focus coaching.
Validate benefit
Confirm the improvement and business benefit.
Recognize
Completed projects and capability are recognized.
What changes
Outcomes designed to remain after the engagement.
Programs within the system
Build the capability that makes this service work.
Related systems
Often connected in transformation.
Start with a diagnostic